检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家电力公司电力自动化研究院,南京210003 [2]东南大学动力工程系,南京210096
出 处:《动力工程》2003年第3期2480-2484,2376,共6页Power Engineering
摘 要:在电站运行优化的目标分析的基础上 ,依照决策支持系统 ( DSS)的结构及其设计思想 ,对电站运行优化决策支持系统 ( OODSS)的结构进行探讨 ,重点对运行优化的关键性难题——优化目标值的确定问题进行深入研究 ,在传统方法的基础上提出基于数据开采技术的新方法 ,并利用决策支持系统解决半结构化问题的优势提出进一步的综合性解决方案。图 2表 2参Based on the target analysis of the operation optimization for a power plant, and according to the structure and designing thinking of Decision Support System (DSS), the overall structure of the Operation Optimization Decision Support System (OODSS) is studied and the decision of the optimization value as a key question of the operation optimization is deeply studied. A new method based on the date mining (DM) technology is used, and with the benefit of DSS on resolving the semi structured problem, a composive scheme is put for ward. Figs 2, tables 2 and refs 5.
关 键 词:发电厂 运行优化 决策支持系统 优化目标值 数据开采
分 类 号:TK267[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117