135 MW循环流化床锅炉的设计  被引量:3

Design on 135 MW CFB Boilers

在线阅读下载全文

作  者:杜守国[1] 姜孝国[1] 

机构地区:[1]哈尔滨锅炉厂有限责任公司,哈尔滨市150046

出  处:《电力建设》2003年第7期7-8,11,共3页Electric Power Construction

摘  要:云南巡检司电厂 1 35MW机组采用了哈尔滨锅炉厂引进ALSTOM公司技术进行设计、制造的循环流化床锅炉。这台燃用褐煤的超高压、一次中间再热、单汽包、自然循环、采用水冷布风板、大直径钟罩式风帽、全钢构件悬吊结构、露天布置的循环流化床锅炉 ,在设计方案中 ,针对该电厂所在地的低气压对点火、燃烬、炉膛受热面布置、尾部对流受热面的影响 ,采取了相应的措施 。MW unit in Xunjianci Power Plant in Yunnan is a CFB boiler designed and manufactured by Harbin Boiler Manufacture with the technology imported from ALSTOM. It is a CFB boiler with fired brown coal, extra high pressure, once intermediate reheat, single steam drum, natural circulation, water cooling cloth wind plate, large-diameter bell-jar type cap, steel suspension structure and outdoor arrangement. Considering the influence of the local low atmospheric pressure on the ignition, combustion, heating area arrangement of the furnace and tail convective heating surface the corresponding measures have been taken in design to guarantee the good performance of the boiler

关 键 词:135MW循环流化床锅炉 燃烧器 再热器系统 燃烧室 省煤器 空气预热器 设计 

分 类 号:TK229.66[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象