检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:奚成刚[1] 杨成永[2] 王勐[2] 许兆义[2] 郝才元[3]
机构地区:[1]交通部公路科学研究所,北京100088 [2]北方交通大学,北京100044 [3]呼和浩特铁路局工务处
出 处:《水土保持学报》2003年第3期38-41,共4页Journal of Soil and Water Conservation
基 金:国家自然科学基金资助项目(50178002)
摘 要:通过对集二铁路沿线风沙害严重路段所布设的各种风沙害工程控制措施的野外观测试验,从控制措施对近地表风速的影响、不同措施的阻积沙效益以及保水效果等方面对各种风沙害控制措施的效益和适用性进行了分析和讨论。研究表明:几种措施的减速效果依次为砖墙>轨枕>荆笆>树枝;直立型控制措施障后防护距离约为其高度的5~10倍,控制措施保水能力大小依次为粘土>原始>荆笆>轨枕>树枝>草方格。The protecting benefits and applicability of the control measures set up along the wind and sand harm section of Jier railway are studied by the field observation experiments, including the effects on wind speed of earths surface and the sandprevent and waterkeep effects, and so on. It shows that:① the control measures wind speeddown effects:brick wall > crosstie > basketry > branch; ② the effect area behind the stand measure is about five to ten times of the measures height; ③ the control measures waterkeep benefits:clay cover > original > basketry > crosstie > branch > grass pane.
关 键 词:铁路风沙害工程 控制措施 防护效益 近地表风速 阻积沙效益 保水效果 工程控制
分 类 号:U216.4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

