Sedimentation retention basin utilization for best management practice  被引量:2

Sedimentation retention basin utilization for best management practice

在线阅读下载全文

作  者:Zaheer Iqbal 

机构地区:[1]CollegeofWaterResourcesandEnvironment

出  处:《Journal of Environmental Sciences》2003年第5期662-668,共7页环境科学学报(英文版)

基  金:TheNationalNaturalScienceFoundationofChina(No.5 0 2 390 30 )

摘  要:Approaches to the artificial impoundment and theoretical design of sedimentation retention basin are reviewed with particular attention to best management practice(BMP) to control agriculture and surface runoff. Sediments retention basins are the small version of farm pond used where a criteria of farm pond is not met. Such basin traps the pollutants and suspended solids prior to entry into streams and lakes. The study is focused with special reference to the assessment and control of non point source pollution(NPSP) from the sub basin area of Tai Lake in the Xishan County of Wuxi City of China. The author suggested two different approaches to conduct this study including theoretical design for sedimentation retention basin and computation of flow, sediment transport and deposition during the artificial impoundment of retention basin for BMP's utilization. Theoretical design will provide a useful function as a first line defense against the movement of sediments and transport of pollutants into the Tai Lake while the assessment of sediments deposition will help to make its proper use and periodic cleanup.Approaches to the artificial impoundment and theoretical design of sedimentation retention basin are reviewed with particular attention to best management practice(BMP) to control agriculture and surface runoff. Sediments retention basins are the small version of farm pond used where a criteria of farm pond is not met. Such basin traps the pollutants and suspended solids prior to entry into streams and lakes. The study is focused with special reference to the assessment and control of non point source pollution(NPSP) from the sub basin area of Tai Lake in the Xishan County of Wuxi City of China. The author suggested two different approaches to conduct this study including theoretical design for sedimentation retention basin and computation of flow, sediment transport and deposition during the artificial impoundment of retention basin for BMP's utilization. Theoretical design will provide a useful function as a first line defense against the movement of sediments and transport of pollutants into the Tai Lake while the assessment of sediments deposition will help to make its proper use and periodic cleanup.

关 键 词:agriculture runoff artificial impoundment best management practice sediment retention basin Tai Lake sub  basin non  point source pollution 

分 类 号:X131[环境科学与工程—环境科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象