检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉理工大学土木工程与建筑学院,武汉430070 [2]武汉大学土木建筑工程学院,武汉430072
出 处:《Journal of Southeast University(English Edition)》2003年第4期387-391,共5页东南大学学报(英文版)
摘 要:This paper is devoted to the nonlinear stress and strain analysis oftunneling and working conditions of Wanjiazhai Division Project No.7 Tunnel in Shanxi province ofChina. The initial geological stress of loess was simulated by grading fill; the theory of unloadingproposed by Duncan and boundary stress of elasticity were used to calculate the excavation of thetunnel; Goodman joint elements were applied to simulate the joints of the liners; both loading andunloading tests have been performed to determine the parameters of Duncan-Chang's model and thecalculated results were compared; Terzaghi' s theory on loosening earth pressure was applied. Manyworking conditions were analyzed and some reasonable results were obtained. Based on the analyses,reparative measures were proposed and completed. The tunnel has functioned well since October, 2001.对山西省万家寨引黄入晋工程总干线 7号隧洞开挖和蓄水运行的几种工况进行了非线性有限元分析 .主要内容包括采用分级堆填过程模拟风积黄土层的初始应力场 ;应用Duncan释放荷载思想和弹性理论面力公式进行开挖卸荷计算 ;采用Goodman节理单元模拟衬砌管片的接缝 ;应用Terzaghi松动土压力理论施加管片上压力 ;确定土的Duncan Chang模型参数时 ,分别取原状土进行了卸载和加载试验 ,并比较了用 2种试验获得的模型参数进行有限元变形分析的结果 。
关 键 词:TUNNEL LOESS nonlinear finite element method loading and unloading test loosening earth pressure STRESS STRAIN
分 类 号:TV672.1[水利工程—水利水电工程] O241.82[理学—计算数学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28