检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《岩石力学与工程学报》2004年第4期592-596,共5页Chinese Journal of Rock Mechanics and Engineering
基 金:湖南省中青年基金(OOJZY2140)资助项目。
摘 要:在上限分析理论基础上,研究非线性Mohr-Coulomb破坏准则下的竖直边坡稳定性问题。首先,通过“切线法”引进变量;其次,根据上限定理对边坡稳定性问题建立含有变量的速度场,将稳定性问题变为含有多变量的非线性规划问题;最后,根据“序列二次规划算法”求出上限非线性规划问题的最优解。通过上限解和前人的研究成果的比较表明,该方法是有效和正确的。A new technique is described for computing rigorous upper bound on stability factors of vertical cut under the condition of plane strain. A perfectly plastic soil model is assumed. The failure of soil is governed by nonlinear yield criterion. Sequential quadratic programming(SQP) is used in conjunction with the limit analysis of classical plasticity theory. A new kinematically admissible velocity field is constructed. When using linear failure criterion that exceeds the actual nonlinear failure criterion,the stability factor formulation of the upper bound theorem leads to a classical nonlinear programming problem,where the objective function,which is to be minimized,corresponds to the dissipated power. The upper bound optimization problem may be solved efficiently by applying a nonlinear SQP algorithm,and stability factors are obtained,which agree well with previous achievements.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.72.3