检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学桥梁工程系,上海200092 [2]清华大学土木工程系,北京100084
出 处:《计算力学学报》2004年第1期50-55,共6页Chinese Journal of Computational Mechanics
基 金:国家自然科学基金(59895410;59938180)资助项目.
摘 要:随着钢拱桥跨径的不断增大,钢拱桥在静风荷载作用下的施工稳定性问题已引起了人们的广泛重视。本文以上海在建的主跨550m的中承式钢拱桥为例,采用几何和材料非线性分析法详细分析了大跨度钢拱桥在两个不同施工阶段下的静风稳定性。结果表明,拱肋最初合拢状态是拱桥施工过程中最不利的状态。最后,详细探讨影响大跨度钢拱桥施工过程中静风稳定性的主要参数。With the increasing span of steel arch bridges, evaluation of wind-induced instability during construction becomes especially important. This study investigates the wind-induced instability of a long-span steel arch bridge with a 550 m-long central span under construction in Shanghai, China. This will be the longest central span among all arch bridges in the world. Both geometric and material nonlinearities are involved in the analysis. Two different construction stages were chosen for this study, namely construction stages I and II. Construction stage I lasts until the closure of the main arch ribs. Construction stage II lasts until all parts have been completed except the stiffening girder of the main span. Three components of wind loads were assumed to act both on the steel girder and the arch ribs in the analysis, namely the drag force, lift force and pitch moment. The results show that the arch bridge is more susceptible to wind-induced instability at the stage II than at the stage I. The effects of various parameters on the wind-induced instability during construction are also discussed.
关 键 词:静风荷载 大跨度钢拱桥 有限元法 非线性分析 稳定性 桥梁施工 临界荷载
分 类 号:U441[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15