检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《建筑技术》2004年第3期173-175,共3页Architecture Technology
基 金:国家自然科学基金项目(50178056)资助
摘 要:挤土桩的挤土效应会引发较为严重的环境问题,对于深层搅拌桩可采取减缓成桩速率等4条措施进行防治;对于钻孔灌注桩可采取机械处理、化学处理、机械化学联合处理、重力沉淀处理等措施;防治桩基沉降引起地铁隧道位移的措施主要有加长工程桩、设置遮拦桩、跟踪注浆法等。The serious environmental problems can be induced by the soil-displacement effects of soil-displaced piles. Four prevention measures can he adopted for the deep mixing piles by reducing the forming pile rate. The measures of the mechanical treatment, the chemi- cal treatment, the combinative treatment of machinery and chemistry, and the gravity deposition treatment can be adopted for the bored cast- in-place piles. The prevention measures for the underground tunnel dis- placement caused by the pile settlement mainly include lengthened piles, setting shelter piles, following grouting method, etc.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.164.60