宁波中银大厦超高层施工竖向变形分析研究  

Analysis and Research on Vertical Deformation of Super High-Rise Construction of Ningbo Bank of China Tower

在线阅读下载全文

作  者:吴桂龙 蒋峰 李沛 

机构地区:[1]上海理工大学环境与建筑学院,上海

出  处:《建模与仿真》2024年第1期523-528,共6页Modeling and Simulation

摘  要:以宁波中银大厦为工程背景,采用midas/gen有限元软件,对超高层建筑进行了考虑混凝土收缩徐变的施工模拟分析。计算采用CEB-FIP (1990)规范中的混凝土收缩徐变模型,得出收缩徐变对结构构件竖向位移及位移差的影响。结果表明:收缩徐变使高层建筑结构产生较大的竖向变形和竖向变形差,必须对结构进行考虑收缩徐变的施工过程分析。The construction simulation analysis of super high-rise buildings considering the shrinkage creep of concrete was carried out by using midas/gen finite element software with Bank of China Tower in Ningbo as the engineering background. The model of concrete shrinkage creep in CEB-FIP (1990) specification was used to calculate the effects of shrinkage creep on vertical displacement and dis-placement difference of structural members. The results show that shrinkage creep causes large vertical deformations and differential vertical deformations in high-rise structures, and it is neces-sary to analyze the structure for the construction process considering shrinkage creep.

关 键 词:超高层 竖向变形 收缩 徐变 施工仿真分析 

分 类 号:TU7[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象