Redesign and Optimization Study of Micro-Hydropower Plant in Manica Mozambique  

Redesign and Optimization Study of Micro-Hydropower Plant in Manica Mozambique

在线阅读下载全文

作  者:Miguel Meque Uamusse Jonas V. Matsinhe Domingos L. P. Macuvele Kenneth M. Persson 

机构地区:[1]Division of Water Resources Engineering, Lund University, Lund, Sweden [2]Faculty of Engineering, Eduardo Mondlane University, Maputo, Mozambique [3]Universidade Pedagogica (UP), Lichinga, Moç ambique

出  处:《Energy and Power Engineering》2017年第2期100-107,共8页能源与动力工程(英文)

摘  要:The micro-hydropower has the technical capability of providing electricity to rural areas in Manica or other isolated place in Mozambique in currently not yet supplied with EDM (Mozambicam electricity Supply Company). Associated that, today more than 12 million of Mozambicans live below the poverty line including in non-electrified areas and most of these populations are rural people. The stochastic ARMA model and Neural Wavelet was built and fitted from the historical 49 years of hydrology predictions. The flow duration curve was plotted based on flow data with objective to find power potential that was 76.8 Kw.The micro-hydropower has the technical capability of providing electricity to rural areas in Manica or other isolated place in Mozambique in currently not yet supplied with EDM (Mozambicam electricity Supply Company). Associated that, today more than 12 million of Mozambicans live below the poverty line including in non-electrified areas and most of these populations are rural people. The stochastic ARMA model and Neural Wavelet was built and fitted from the historical 49 years of hydrology predictions. The flow duration curve was plotted based on flow data with objective to find power potential that was 76.8 Kw.

关 键 词:MICRO HYDROPOWER RENEWABLE ENERGY Manica Mozambique 

分 类 号:R73[医药卫生—肿瘤]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象