作 者:Gao Yi Songtao Zhang Chao Qin Yuan Zeng Yang Yang Yingying Liu Shengwei Li
机构地区:[1]State Grid Tianjin Power Economics & Technology Research Institute, Tianjin, China [2]Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin, China
出 处:《Energy and Power Engineering》2017年第4期675-682,共8页能源与动力工程(英文)
摘 要:This paper presents an auxiliary planning method for intelligent substation access system based on security region. Firstly, the method of resolving the static voltage security region is proposed. Secondly, the method of constructing the optimal index of substation accession is given, which is used to describe the priority of the node into the substation. Finally, a complete set of intelligent substation access system auxiliary planning strategy is given, which takes into account the constraints of the normal operation of the grid on the voltage amplitude.This paper presents an auxiliary planning method for intelligent substation access system based on security region. Firstly, the method of resolving the static voltage security region is proposed. Secondly, the method of constructing the optimal index of substation accession is given, which is used to describe the priority of the node into the substation. Finally, a complete set of intelligent substation access system auxiliary planning strategy is given, which takes into account the constraints of the normal operation of the grid on the voltage amplitude.
关 键 词:SUBSTATION the STATIC SECURITY REGION Optimized Index of SUBSTATION ACCESSION