A Branch-and-Bound Based Heuristic Algorithm for Minimizing Makespan in Machining-Assembly Flowshop Scheduling  被引量:1

A Branch-and-Bound Based Heuristic Algorithm for Minimizing Makespan in Machining-Assembly Flowshop Scheduling

在线阅读下载全文

作  者:Kazuko Morizawa 

机构地区:[1]Graduate School of Engineering, Osaka Prefecture University, Osaka, Japan

出  处:《Engineering(科研)》2014年第13期877-885,共9页工程(英文)(1947-3931)

摘  要:This paper proposes a heuristic algorithm, called list-based squeezing branch and bound algorithm, for solving a machine-fixed, machining-assembly flowshop scheduling problem to minimize makespan. The machine-fixed, machining-assembly flowshop consists of some parallel two-machine flow lines at a machining stage and one robot at an assembly stage. Since an optimal schedule for this problem is not always a permutation schedule, the proposed algorithm first finds a promising permutation schedule, and then searches better non-permutation schedules near the promising permutation schedule in an enumerative manner by elaborating a branching procedure in a branch and bound algorithm. The results of numerical experiments show that the proposed algorithm can efficiently provide an optimal or a near-optimal schedule with high accuracy such as mean relative error being less than 0.2% and the maximum relative error being at most 3%.This paper proposes a heuristic algorithm, called list-based squeezing branch and bound algorithm, for solving a machine-fixed, machining-assembly flowshop scheduling problem to minimize makespan. The machine-fixed, machining-assembly flowshop consists of some parallel two-machine flow lines at a machining stage and one robot at an assembly stage. Since an optimal schedule for this problem is not always a permutation schedule, the proposed algorithm first finds a promising permutation schedule, and then searches better non-permutation schedules near the promising permutation schedule in an enumerative manner by elaborating a branching procedure in a branch and bound algorithm. The results of numerical experiments show that the proposed algorithm can efficiently provide an optimal or a near-optimal schedule with high accuracy such as mean relative error being less than 0.2% and the maximum relative error being at most 3%.

关 键 词:Scheduling HEURISTIC Branch and BOUND Algorithm Machining-Assembly FLOWSHOP MAKESPAN 

分 类 号:R73[医药卫生—肿瘤]

 