检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Stefan Runge Thorsten Stoesser Emily Morris Madeleine White
机构地区:[1]Hydro-Environmental Research Centre, Cardiff University, Cardiff, Wales, UK
出 处:《Journal of Power and Energy Engineering》2018年第8期63-85,共23页电力能源(英文)
摘 要:In this paper, the development of a vertical axis hydrokinetic twin turbine for harvesting energy from flowing water in man-made channels is described. The Technology Readiness Level (TRL) assessment procedure, developed by NASA and modified by the US Department of Energy, is followed and it is shown that the hydrokinetic turbine successfully reaches TRL 7, which is a full-scale, similar (prototypical) system demonstrated in a relevant environment. The concept of the twin turbine (TRL 1 - 3) is first validated and tested using a 1:10 scale laboratory model at Cardiff University and efficiencies of up to 75% are achieved (TRL 4 - 5). In order to justify system functionality and performance in a relevant environment as well as up-scalability, a 1:3 scale model of the twin turbine is implemented and tested in a discharge channel of a water treatment plant in Atlanta, thereby achieving TRL6. This paved the way for an application in the form of an array of ten full-scale twin turbine prototypes, including all relevant components such as housing, drive-train, gear-box and generator. Successful deployment and testing in the South Boulder Canal near Denver means that the hydrokinetic twin turbine system reached TRL7.In this paper, the development of a vertical axis hydrokinetic twin turbine for harvesting energy from flowing water in man-made channels is described. The Technology Readiness Level (TRL) assessment procedure, developed by NASA and modified by the US Department of Energy, is followed and it is shown that the hydrokinetic turbine successfully reaches TRL 7, which is a full-scale, similar (prototypical) system demonstrated in a relevant environment. The concept of the twin turbine (TRL 1 - 3) is first validated and tested using a 1:10 scale laboratory model at Cardiff University and efficiencies of up to 75% are achieved (TRL 4 - 5). In order to justify system functionality and performance in a relevant environment as well as up-scalability, a 1:3 scale model of the twin turbine is implemented and tested in a discharge channel of a water treatment plant in Atlanta, thereby achieving TRL6. This paved the way for an application in the form of an array of ten full-scale twin turbine prototypes, including all relevant components such as housing, drive-train, gear-box and generator. Successful deployment and testing in the South Boulder Canal near Denver means that the hydrokinetic twin turbine system reached TRL7.
关 键 词:Hydro-Turbine Vertical-Axis VAT MICRO-HYDRO TRL Technology Readiness Level
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.189