检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Yvonne Andersson-Skold Stefan Falemo Marius Tremblay
机构地区:[1]Swedish Geotechnical Institute(SGI),Goteborg,Sweden [2]Department of Earth Sciences,University of Gothenburg,Goteborg,Sweden [3]COWI AB,Goteborg,Sweden [4]AF Infrastructure,Goteborg,Sweden [5]Tyréns,Geotechnical Engineering,Goteborg,Sweden
出 处:《Natural Science》2014年第3期130-143,共14页自然科学期刊(英文)
摘 要:Effective landslide risk management requires knowledge of the landslide risks. This paper presents a risk assessment methodology for semiregional scale. The landslide probability is assessed taking into account expected climatechange in the case study area (the G?ta river valley). Climate change is expected to result in increased erosion and water fluctuations. There are large areas with marine clays, often quick clay, in the area and the landslide process can be rapid with extensive damages and casualties. The consequence methodology includes a wide range of consequences assessed by monetary valuation. The consequences and the landslide probability are combined as pairs of values in a risk matrix and the risk is also presented on a map. The map has been used as discussion and decision bases in the municipalities in the G?ta river valley, in the county administration and on governmental level to estimate the needs of risk mitigation and to make priorities.Effective landslide risk management requires knowledge of the landslide risks. This paper presents a risk assessment methodology for semiregional scale. The landslide probability is assessed taking into account expected climatechange in the case study area (the G?ta river valley). Climate change is expected to result in increased erosion and water fluctuations. There are large areas with marine clays, often quick clay, in the area and the landslide process can be rapid with extensive damages and casualties. The consequence methodology includes a wide range of consequences assessed by monetary valuation. The consequences and the landslide probability are combined as pairs of values in a risk matrix and the risk is also presented on a map. The map has been used as discussion and decision bases in the municipalities in the G?ta river valley, in the county administration and on governmental level to estimate the needs of risk mitigation and to make priorities.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.28.3