检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Panagiotis Angelidis Michalis Kotsikas Kyriakos Kopasakis Fotios Maris Nikos Kotsovinos
出 处:《Computational Water, Energy, and Environmental Engineering》2018年第2期51-68,共18页水能与环境工程(英文)
摘 要:Major flood events occurred in the Arda River region in the last decades with great economic, social and environmental effects. A specific software package has been developed for the simulation of the flood runoff and routing process of the transboundary Arda River basin. The software package is taking into account the existence of the three cascade Bulgarian reservoirs aiming to flood protection and power optimization. Inflow estimations for duration of five days ahead and initial water levels at the three reservoirs are imported at the beginning of the simulation. The management tool includes all the alternative operation modes of hydropower plants, water released from spillways, and river and reservoir flow characteristics in order to optimize the total system (power generation and flooding costs) during the flood event. The developed software is also an efficient tool for the establishment of a flood warning system.Major flood events occurred in the Arda River region in the last decades with great economic, social and environmental effects. A specific software package has been developed for the simulation of the flood runoff and routing process of the transboundary Arda River basin. The software package is taking into account the existence of the three cascade Bulgarian reservoirs aiming to flood protection and power optimization. Inflow estimations for duration of five days ahead and initial water levels at the three reservoirs are imported at the beginning of the simulation. The management tool includes all the alternative operation modes of hydropower plants, water released from spillways, and river and reservoir flow characteristics in order to optimize the total system (power generation and flooding costs) during the flood event. The developed software is also an efficient tool for the establishment of a flood warning system.
关 键 词:RESERVOIRS HYDROPOWER Floods Flood HYDROGRAPH ROOTING Software Development Arda RIVER
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13