A new RIB project, the Beijing Radioactive Ion-beam Facility (BRIF), has been running at CIAE since 2004. In this project, a 100 MeV H-cyclotron, CYCIAE-100, is selected as the driving accelerator providing a 75-100...
The design and construction of Beijing Radioactive Ion-beam Facility (BRIF) was started at China Institute of Atomic Energy -CIAE) in 2004. In this project, a 100 MeV high intensity cyclotron, CYCIAE100, is selected a...
A 100MeV compact high intensity H-cyclotron is under design and construction at CIAE which will provide a 75MeV—100MeV,200μA proton beam.The main magnet of this cyclotron adopts an integrally compact structure with ...
In order to study the technology on cyclotron design,and to carry out researches on the crucial parts including the main magnet,beam diagnostics and engineering technology to accomplish the experimental verification o...