RESCHEDULING

作品数:28被引量:62H指数:4
导出分析报告
相关领域:自动化与计算机技术更多>>
相关期刊:《High-Speed Railway》《Frontiers of Engineering Management》《自动化学报》《Computer Systems Science & Engineering》更多>>
相关基金:国家自然科学基金国家重点基础研究发展计划中国博士后科学基金浙江省自然科学基金更多>>
-

检索结果分析

结果分析中...
选择条件:
  • 期刊=Journal of Iron and Steel Research Internationalx
条 记 录,以下是1-2
视图:
排序:
Production scheduling problems of steelmaking-continuous casting process in dynamic production environment被引量:4
《Journal of Iron and Steel Research International》2017年第6期586-594,共9页Zhong Zheng Jian-yu Long Xiao-qiang Gao 
financially supported by the National Natural Science Foundation of China(Nos.51474044 and 50574110);Key Projects of Chongqing Science and Technology Research Projects ( No. CSTC2011AB3053)
A concept of production scenario for the steelmaking continuous casting production process and the mathe- matical description of such concept were proposed. The production scenario was described with the varia- tion o...
关键词:SchedulingReschedulingSteelmakingContinuous castingDisturbanceProduction scenario 
A Rescheduling Method for Operation Time Delay Disturbance in Steelmaking and Continuous Casting Production Process被引量:7
《Journal of Iron and Steel Research International》2012年第12期33-41,共9页YU Sheng-ping PAN Quan-ke 
Sponsored by National Basic Research Program of China(2009CB320601);National Natural Science Foundation of China(61104174,61174187)
In the steelmaking and continuous casting (SMCC) production process, operation time delay may lead to casting break or processing conflict so that the initial scheduling plan becomes unrealizable. Existing research ...
关键词:SMCC RESCHEDULING DISTURBANCE heuristic algorithm 
检索报告 对象比较 聚类工具 使用帮助 返回顶部