supported in part by the Postdoctoral Fellowship Program of CPSF under Grant Number GZB20240105;in part by the China Postdoctoral Science Foundation under Grant Number 2024M750349;in part by the National Natural Science Foundation of China under Grant Number 52407084.
Multistage robust unit commitment(MRUC)is an important decision-making problem in power system operations.The affine policy facilitates problem-solving,but it compromises flexibility.This letter proposes a partially a...
supported by the National Natural Science Foundation of China 51937005;the Natural Science Foundation of Guangdong Province 2019A1515010689.
High penetration level of renewable energy has brought great challenges to operation of power systems,and use of flexible resources(FRs)is becoming increasingly important.Flexibility of power systems can be improved b...
supported by Beijing Outstanding Young Scholar Program;the National Key Research and Development Program of China (2021YFA0718303, 2021YFA1400904, and 2016YFA0301501);the National Natural Science Foundation of China (91736208, 11974202, 61975092, 11920101004,61727819, 11934002, 11734010, and 92165203);the XPLORER Prize。
Ramping a physical parameter is one of the most common experimental protocols in studying a quantum system, and ramping dynamics has been widely used in preparing a quantum state and probing physical properties. Here,...
supported in part by the National Key Research and Development Program of China(No.2019YFB1505400).
In northern China,thermal power units(TPUs)are important in improving the penetration level of renewable energy.In such areas,the potentials of coordinated dispatch of renewable energy sources(RESs)and TPUs can be bet...
supported in part by New Zealand Ministry of Business,Innovation and Employment(MBIE)by the Strategic Science Investment Fund“Advanced Energy Technology Platforms”under Contract RTVU2004;2020 Google Excellence Research University Program;US DOE Ernst Courant Traineeship in Accelerator Sciences and Engineering,the educational program of next generation of accelerator physicists and engineer,US Department of Energy,HEP office.
AC loss is one of the critical issues for designing REBCO fast‐ramping magnets operating at cryogenic temperatures.There are many ways to reduce AC loss for coil windings.However,it is not clear which method is the m...
To avoid negative consequences to freshwater biota from climate change,society must complete the transition from fossil to renewable electricity sources.However,temporal patterns in hydropower generation(and flow rele...
This work was supported by a Research Grant of Pukyong National University(2020).
The roll-out of a flexible ramping product provides independent system operators(ISOs)with the ability to address the issues of ramping capacity shortage.ISOs procure flexible ramping capability by committing more gen...
This work was supported partly by the Engineering and Physical Sciences Research Council(EPSRC)under Grant EP/N032888/1 and Grant EP/L017725/1;by GEIDCO under Grant 1474100.
Climate and weather-propelled wind power is characterized by significant spatial and temporal variability.It has been substantiated that the variability of wind power,in addition to contributing hugely to the instabil...
supported by the National Natural Science Foundation of China(Grant Nos.11872195,11472120);the Fundamental Research Funds for the Central Universities(Grant No.lzujbky-2020-1)。
The layer-wound coil has a great potential in nuclear magnetic resonance and magnetic resonance imaging owing to the better spatial homogeneity of the magnetic field.However,high-temperature superconducting(HTS)coil w...
High penetration of renewable energy generation(REG)in the distribution system increases both the power uncertainty at a given interval and the power variation between two intervals.Reserve markets addressing power un...