supported by Shanghai Pilot Program for Basic Research-Shanghai Jiao Tong University (No.21TQ1400202).
The real-time prediction of a floating platform or a vessel is essential for motion-sensitive maritime activ-ities.It can enhance the performance of motion compensation system and provide useful early-warning informat...
In this study,the Jinzhou 9-3 CEPD float-over installation project was investigated.During the undocking condition,the water depth of the motion path of the working barge gradually changed from 10.31 m to 9.41 m.The u...
This study was supported by the National Natural Science Foundation of China(Grant Nos.52006148 and 51976131);the Capacity Building Project of Local Institutions of Shanghai“Action Plan for Scientific and Technological”(Grant Nos.19060502200).
Offshore wind farm construction is nowadays state of the art in the wind power generation technology.However,deep water areas with huge amount of wind energy require innovative floating platforms to arrange and instal...