On April 25,at the 2016 Luoyang Aluminum Futures Delivery Warehouse Promotion Meeting&Inauguration Ceremony for Aluminum Futures Designated Delivery Warehouse of CMST Development Co.,Ltd Luoyang Branch,Shen Zhongming,...
On December 26, 2012, as forklifts shipped the 10000th tonne of nickel plate into the finished product warehouse of Xinjiang Nonferrous Group Fukang Smelting Plant, Xinjiang’s annual production of electrolytic nickel...
Pingan high quality aluminum plate and strip project has its cold rolling part fully launched, with the entire design from Beris Engineering and Research Corp.The contract for hot roll- ing and high rack warehouse has...