supported in part by the Liaoning Province Xingliao Talents Plan Project under Grant No.XLYC2006017;in part by the Scientific Research Funds Project of Educational Department of Liaoning Province under Grant Nos.LG202025 and LJKZ0260。
A cooperative game theoretical approach is taken to production and transportation coordinated scheduling problems of two-machine flow-shop(TFS-PTCS problems)with an interstage transporter.The authors assume that there...
supported in part by the National Natural Sci-ence Foundation of China(NSFC)under Grant No.71801051.
This paper systematically studies the two machine flow-shop scheduling problems with no-wait and deterministic unavailable interval constraints.To minimize the makespan,three integer programming mathematical models ar...