SCHEDULE

作品数:327被引量:308H指数:7
导出分析报告
相关领域:自动化与计算机技术更多>>
相关作者:汤卫平宋宝燕于戈郭迪王玺更多>>
相关机构:清华大学北京航空航天大学南京航空航天大学国防科学技术大学更多>>
相关期刊:更多>>
相关基金:国家自然科学基金国家重点基础研究发展计划中国博士后科学基金北京市自然科学基金更多>>
-

检索结果分析

结果分析中...
选择条件:
  • 主题=AHEADx
条 记 录,以下是1-10
视图:
排序:
CSSC Achievess Year-Round Deliveries ahead of Schedule
《船舶经济贸易》2023年第1期58-61,共4页He Baoxin 
The 110.000 DWT LNG dualfuel powered product tanker"Proteus Tracy"huilt by CSSC Guangzhou Shipyard International(GSI)was completed and delivered on December 22,2022,fulfilling the year-round ship deliveries ahead of s...
关键词:ROUND PROTEUS AHEAD 
Scenario of China Reaching Carbon Peaking ahead of Schedule and Its Effect on Macro Economy
《Frontiers of Economics in China-Selected Publications from Chinese Universities》2022年第2期212-244,共33页LU Chuanyi CHEN Wenying 
the research progress and outcomes of the national key research and development program"Simulation Research on China's Climate Change Response and Path of Coordinated Governance of Economic and Social Environment"(No.2018YFC1509006).
At the 75th session of the United Nations General Assembly(UNGA)in 2020,China put forward the goal of peaking carbon dioxide emissions by 2030 and achieving carbon neutrality by 2060,a move to lead global response to ...
关键词:carbon peaking ahead of schedule computable general equilibrium(CGE) carbon tax macro economy 
The Road to Low-Carbon Transformation
《China Today》2021年第1期22-25,共4页HE JIANKUN 
CHINA made the commitment to reduce its CO2 emissions per unit of GDP by 40-45 percent by 2020 as compared with 2005 at the UN Climate Change Conference 2009 in Copenhagen;and simultaneously increase the proportion of...
关键词:TRANSFORMATION SCHEDULE AHEAD 
Day-ahead Optimization Schedule for Gas-electric Integrated Energy System Based on Second-order Cone Programming被引量:26
《CSEE Journal of Power and Energy Systems》2020年第1期142-151,共10页Yonghui Sun Bowen Zhang Leijiao Ge Denis Sidorov Jianxi Wang Zhou Xu 
This work was supported in part by the National Natural Science Foundation of China under Grants 61673161 and 51807134;and in part by the program of fundamental research of the Siberian Branch of Russian Academy of Sciences and carried out within the framework of the research project III.17.3.1,Reg.No.AAAA-A17-117030310442-8.
This paper proposes an optimal day-ahead opti-mization schedule for gas-electric integrated energy system(IES)considering the bi-directional energy flow.The hourly topology of electric power system(EPS),natural gas sy...
关键词:Day-ahead optimization schedule integrated energy system natural gas system second-order cone programming 
Enlightenment brought by the ahead-of-schedule implementation of Yangtze River Delta ECA
《中国船检》2017年第11期110-111,共2页LiuXiao 
From November 2015, the Ministry of Transport published the Implementation Plan of Ship Emission Control Area in the Pearl River Delta, Yangtze River Delta and Waters around Bohai Sea (Beijing-Tianjin-Hebei) (hereinaf...
关键词:BEIJING-TIANJIN-HEBEI hereinafter referred to as the“Implementation Plan” 
CNOOC's Penglai 19-3 Oil Field Phase Ⅱ Came on Stream
《China Chemical Reporter》2008年第29期15-15,共4页
On September 16th,2008 CNOOC an-nounced that Platform B of Phase Ⅱ of Peng Lai(PL) 19-3 in Shandong province came on stream successfully ahead of schedule.Phase Ⅱ of PL 19-3 includes five well-head platforms,a centr...
关键词:SHANDONG AHEAD SCHEDULE FLOATING currently oilfiel 
BZ 34-1 Starts Production Ahead of Schedule
《China Chemical Reporter》2008年第2期11-11,共4页
On December 25th,2007 CNOOC Limited announced that Bo Zhong(BZ)34-1,an oilfield in Bohai Bay,had successfully come on stream ahead ofschedule.More than 4800 barrels of oil per day are produced from 7
关键词:SCHEDULE AHEAD OILFIELD Bohai wholly OWNED 
1.0 Billion M3/A Natural Gas Project in Daniudi Completed Ahead of Schedule
《China Chemical Reporter》2005年第35期12-12,共1页
On Nov. 4 a ceremony for the summaryand commendation of the first-phase1.0 billion m^3/a natural gas project inDaniudi Gasfield was held by Sinopecat the first station of the Dayu gas trans-mission pipeline located in...
关键词:SCHEDULE CEREMONY pipeline transmitted 
PROJECT NEWS
《China Chemical Reporter》2005年第33期13-14,共1页
Lucite International Opens MMA Plant in Shanghai Lucite International announced that its new methyl methacrylate (MMA) plant located in Caojing, Shanghai was completed ahead of schedule, and is now available at full c...
关键词:completed CUSTOMER facility AHEAD EXPAND attracting METHACRYLATE OPPORTUNITY SCHEDULE methanol 
A world-level dam stands on Nanya River
《Electricity》2005年第A04期2-2,共1页
Seated at the southern foot of Mount Gonga in Sichuan and being the Asian highest rock-fill dam with asphaltic concrete core, the dam project of Yele Hydropower Station was completed fourty-three days ahead of schedul...
关键词:completed AHEAD SCHEDULE STANDS ROCK smoothly Moun 
检索报告 对象比较 聚类工具 使用帮助 返回顶部