Research and Demonstration of Direct Air-Cooling System for 600-MW Fossil-Fired Power Plants
《Electricity》2011年第4期46-51,共6页Zhang Xiaolu 1 , Wang Jianping 2 , Hu Zhenling 3 1. China Power Investment Corporation 2. China Power Engineering Consulting Group Corporation 3. Harbin Air Conditioning Co., Ltd., 
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t...
关键词:thermal power generating unit air-cooling direct air-cooling project demonstration 
Analysis on Operation Reliability of Generating Units in 2009
《Electricity》2010年第3期26-31,共6页Zhou Hong Power Reliability Management Center Li Shixue 
This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or above th...
关键词:power plant     generating unit operation reliability     statistical data 
Main innovative achievements in Three Gorges Project
《Electricity》2005年第A04期4-4,共1页
Reasonable layout of multi-purpose project For the layout of multi-purpose project, three factors, namely flood control, power generation and navigation, were comprehensively taken into account. Thereupon the problem ...
关键词:INNOVATIVE layout NAVIGATION GENERATING insufficie 
Analysis on the Problems in Start-up and Debugging of Two 600 MW Generating Units in Yangzhou No.2 Thermal Power Plant
《Electricity》2001年第2期11-15,共5页蒯狄正 
The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS ...
关键词:start-up and debugging problems analysis remedial measures 600 MW generating unit 
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
《Electricity》2000年第3期45-45,共1页
关键词:The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation 
Generating to serve the needs of Hong Kong
《Electricity》1998年第2期5-7,共3页
关键词:Generating to serve the needs of Hong Kong 
Adjusting and Optimizing Structure of Energy Sources for Power Generation of Fujian Province in the 21st Century
《Electricity》1997年第3期8-12,共5页Chen Chaozhu(Fujian Provincial Electric Power Bureau) 
The author puts forward the pattern of optimizing the structure of energy sources for generating power in the early stage of the 21st century in Fujian Province; analyzes imper’tant functions on speeding up nuclear p...
关键词:ENERGY SOURCES GENERATING POWER structure optimization NUCLEAR POWER 
An experimental fast neutron reactor planned to build in China
《Electricity》1996年第3期21-21,共1页
China plans to build an experimental fast neutron breeding reactor by 2000 to lay a solid technological foundation for the construction of commercial fast neutron reactors. The preliminary designs for the facility are...
关键词:NEUTRON facility PLANNED TECHNOLOGICAL completed preliminary Nuclear electricity BREEDING GENERATING 
Macroscopic analysis of optimum water power installed capacity in power system
《Electricity》1992年第4期13-16,共4页Li Yibin Northwest China Electric Power Administration 
There are two kinds of generating equipment in a firmly con-nected power network,one is water power plants(shortenedas“water power”,below),the other is thermal power plants(includingcoal-fired,oil-fired and nuclear ...
关键词:installed firmly fired GENERATING itself RESERVOIRS RESERVE SHARES slightly shortened 
Shiheng Coal-fired Power Plant An example plant for digesting & assimilating imported technology Warmly welcome cooperation from abroad for its expansion project
《Electricity》1992年第4期64-64,共1页Da Hongxing DirectorLi Ruwei Deputy Director Shiheng Thermal Power Plant,Shandong Province 
Shiheng Coal-fired Power Plant,situated at the foot of thefamous Taishan Mountain and about 100 km southwestof Jinan,the capital of Shandong Province,is a major power plant inShandong Provincial Grid,with a total inst...
关键词:IMPORTED COOPERATION SHANDONG installed Jinan WELCOME GENERATING situated fired solely 