钱江特大隧道盾构推进段施工风险评估  被引量:23

Risk Assessment on Shield Excavation in Very Large Tunnel Across Qiantang River

在线阅读下载全文

作  者:潘学政[1] 陈国强[1] 彭铭[2] 

机构地区:[1]杭州市公路管理局,杭州310004 [2]同济大学地下建筑与工程系,上海200092

出  处:《地下空间与工程学报》2007年第z1期1245-1254,共10页Chinese Journal of Underground Space and Engineering

摘  要:以钱江特大盾构隧道为背景,对盾构推进段施工过程中的风险点进行辨识,探讨了各项风险的发生机理,并采用同济大学开发的盾构隧道施工风险管理与控制软件(TRM1.0),对调研数据进行了计算分析以评定风险等级,最后结合分部工程分析给出了风险控制措施以及相应的结论和建议。With the background of the very large shield tunnel across Qiantang river in Zhejiang Province,this paper identifies the risks of shield excavation and studies their cause in detail.The risk assessment and its rank were finished by using the Risk Management Software(TRM 1.0)to calculate the inquisitional data from many experts. Finally,some measures to reduce or control the risk loss are given,and some conclusions and suggestions were pro- posed here.

关 键 词:风险评估 隧道施工 钱江隧道 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象