检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李锁平[1]
机构地区:[1]中铁第一勘察设计院集团公司,西安710043
出 处:《铁道标准设计》2012年第8期23-26,共4页Railway Standard Design
摘 要:哈拉曼(Haramain)高速铁路路基设计长度超过98%,普遍存在深挖高填路基,并在路基沉降控制、断面形式及填料要求等方面别具一格,具有与我国高速铁路不同的设计特点和设计思路。结合我国现行的规范和相关的规定,深入细致的研究有助于我国在设计工作中予以借鉴或参考,取长补短以提高我国设计企业的国际竞争力,为走向中东或国际市场创造条件。In Haramain High-speed Railway,the subgrade's design length exceeds 98 percent,and always exists as the ways of deep excavation or high earth filling.Then the requests on the settlement control,section type and the filling materials and so on are special,which are different with our country's high-speed railway design characteristics and design ideas.The article,combining with our current standards and relevant specifications,makes deep research to contribute some reference for design works of our country,and learns from others to improve the international competitive strength of design enterprises in China so as to create the conditions of entering into the Middle East or international market.
关 键 词:高速铁路 铁路路基 填挖高度 结构填料 沉降控制
分 类 号:U23[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112