检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《岩土力学》2009年第S2期283-286,共4页Rock and Soil Mechanics
摘 要:郑州至西安铁路客运专线为时速350千米的无砟轨道铁路,其路基竣工后不允许发生15mm以上的沉降,为满足该要求,开展了相关试验研究,确定了湿陷性黄土地基处理原则,采用水泥土挤密桩、长短桩及埋入式连续桩板结构成功地对地基进行了处理,取得的成果对即将修建的西宝客专、宝兰客专、西成客专及大西客专具有借鉴意义。Zhengzhou-Xi'an passenger dedicated railway line is 350 kilometers per hour ballastless track;its allowable subgrade settlement should be less than 15 mm after completion of the subgrade.In order to meet the requirements,the relevant tests are carried out;and the collapsible loess subgrade treatment principles are determined.And the subgrade are treated successfully by using cement-soil compacted piles,long and short piles and embedding continuous pile-board structure.The achievement will be reference to the upcoming construction of Xi'an-Baoji passenger dedicated line,Baoji-Lanzhou passenger dedicated line,Xi'an-Chengdu passenger dedicated line.
分 类 号:U213.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3