检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张希贤[1] 虞苏芳[1] 朱继懋[1] 王玉娟[1]
机构地区:[1]上海交通大学
出 处:《海洋工程》1996年第4期68-76,共9页The Ocean Engineering
摘 要:MG-1型海缆埋设系统是专为埋设中日海底光缆研制的。本系统装备于“邮电1号”敷缆船上,是一个经济、高效、具有现代化测控系统的犁埋式作业系统。1993年仅用13个小时就顺利地完成了中日海底光缆中国侧90km的埋设工作。本系统于1994年6月通过技术鉴定。1995年获得邮电部三等奖。MG-1系统除可用于埋设海底通信电缆外,也可用于埋设其它海底电缆。本文对系统总体设计中考虑的问题。MG 1 Submarine Cable Burying System was specially designed and made for burying China Japan Submarine Optical Fibre Cable.This is a plough burying system installed on the cable layer“YOUDIAN 1”.It is an economic and efficient operating system with modern surveying equipment.It only took 13 hours to lay successfully 90km Chinese section of Sino Japanese submarine communication cable in 1993.Technical approval test of this system was passed in June,1994. This system was awarded third prize by the Ministry of Post and Telecommunications in 1995.MG system can be used to bury other submarine cables in addition to submarine communication cable. This paper presents some major factors in the period of designing, the design results,and outline of sea trials and cable burying operations as well.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229