双线隧道提速后的瞬变压力及缓解措施  被引量:1

Research on the Problem of Transient Pressure in Tunnel of China's Double Track Railway with the Trains Being Speed up and its Reduction Measures

在线阅读下载全文

作  者:杨斌[1] 谢金宝[1] 于丽颖[1] 

机构地区:[1]兰州交通大学,甘肃兰州730070

出  处:《铁道工程学报》2006年第8期73-75,共3页Journal of Railway Engineering Society

摘  要:研究目的:通过计算,分析我国双线隧道中存在的瞬变压力问题,并提出相应的缓解措施。研究方法:以兰武二线中的双线隧道为例,采用公式法和M atlab多项式拟合出列车速度与最大瞬变压力的关系曲线。研究结果:计算结果表明:在上古浪峡隧道中,当列车速度超过145 km/h时,瞬变压力不能满足旅客乘车的“舒适度”标准。研究结论:提速后,我国既有线上一些双线隧道的瞬变压力不能满足旅客乘车的“舒适度”标准。在以后的建设中,应根据具体情况采取主动或被动缓解措施。Research purposes: According to the calculation, this paper analyzed the transient problem of existing double -track tunnel and put forward the reduction measures. Research methods:Take the double -track tunnel in the Lanzhou -Wunan for example, the relation graph of train speed and maximum pressure has been simulated and figured out with the formula. Research results:The result of calculation indicates that transient pressure on the tunnel of Shanggulangxia can not reach the standard of comfort while traveling speed is over 145 km/h. Research conclusions: With the trains being - speed up, the transient pressure of double - track tunnel in the existing railway can not reach the standard of comfort. In the future construstion, we should take active or passive reduction methods according to the specific situation.

关 键 词:瞬变压力 双线隧道 缓解措施 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象