检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《铁道运输与经济》2007年第5期78-80,共3页Railway Transport and Economy
摘 要:为了在客货共线运行图中有效利用旅客列车运行线两侧的空档,尽可能多地铺画货物列车运行线,以提高区段通过能力,在扣除系数表格计算法的基础上,按照附加扣除时间最少的原则,分析了在双线自动闭塞区段单列旅客列车和2列旅客列车两侧货物列车运行线的合理铺画方案。并通过应用实例给出了最大量铺画货物列车运行线的方法。In order to effectively use thevacant space beside the passenger train paths in the train running diagram of mixed passenger and freight lines and draw more freight train paths to improve the carrying capacity, the essay analyzes the reasonable drawing plan for freight train paths beside single passenger train and two passenger trains respectively on the double tracked section with automatic blocking system according to the principle of minimal additional removal time and on the basis of the calculation method of removal coefficient table. The essay also proposes an approach to maximally draw freight train paths with actual examples.
关 键 词:运行图 双线自动闭塞区段 扣除系数 货物列车运行线
分 类 号:U292.41[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.172.7