立式行星磨启动时间的确定与动态仿真  被引量:1

Determination of Start-Up Time of Vertical Planetary Mill and Its Dynamic Simulation

在线阅读下载全文

作  者:郝雪弟[1] 李耀刚[2] 刘立[1] 尹常治[1] 卞致瑞[1] 

机构地区:[1]北京科技大学 [2]河北理工大学

出  处:《金属矿山》2007年第6期62-64,79,共4页Metal Mine

摘  要:分析了立式行星磨的结构特性,利用牛顿定理建立了系统的动力学方程。采用线性关系表示异步电动机启动阶段转速与时间的关系,计算出立式行星磨的启动时间范围为7.94—10.32s。采用多体动力学软件ADAMS模拟了立式行星磨启动阶段的动态行为,建议实际操作时以适当的软启动方式启动,开车10s后加入物料并使加料均匀。The kinetic equation of vertical planetary mill is established using the Newtong Law based on the analysis of its structural characteristics. The start-up time of the mill is calculated to be 7.94 - 10.32 s by a linear formulation for the rotating velocity-time relationship to be 7.94 - 10.32 s. The dynamic behavior of vertical planetary mill in the start stage is simulated by multi-body dynamics simulation software ADAMS. It is suggested that the mill be started by soft mode and the material be fed uniformly 10s after the start.

关 键 词:立式行星磨 虚拟样机 动力学 ADAMS 启动时间 动态仿真 

分 类 号:TD453[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象