基于不同地表倾角的连拱隧道施工优化分析  被引量:9

Optimization of Construction Procedures in a Double-arch Tunnel Based on Different Slope Angles of Surface Ground

在线阅读下载全文

作  者:安永林[1] 彭立敏[1] 赵丹[1] 朱向前[1] 

机构地区:[1]中南大学土木建筑学院,湖南长沙410075

出  处:《郑州大学学报(工学版)》2007年第2期39-42,共4页Journal of Zhengzhou University(Engineering Science)

基  金:铁道部科技司科技攻关项目(2003G036)

摘  要:基于平面应变问题,采用Druck—Prager屈服准则,研究不同地表倾角对偏压连拱隧道不同施工方法的施工力学性能的影响.通过对隧道二次衬砌力学特性及中隔墙受力分析,确定其较优的施工方法.模拟结果表明:地面倾角为5°~15°时,宜先开挖埋深较小一侧;地面倾角为15°~30°时,若能确保中隔墙稳定,则宜先开挖埋深较小一侧;反之,宜先开挖埋深较大一侧;先开挖洞室的墙脚安全系数较小,在施工中应注意加强.Construction mechanics caused by different construction procedures under different slope angle of surface ground are analyzed based on a plain strain problem using Druck-Prager yield law in a partial pressure double - arch tunnel. Optimization of construction procedures is got by comparing mechanics of secondary lining and middle wall. Results show that it is reasonable to firstly excavate the shallower tunnel when the slope angle is between 5 degree and 15 degree. When it is between 15 degree and 30 degree, it is also reasonable to first excavate the shallower if the middle wall is steady. However, if the middle wall is unsteady due to seriously partial pressure, it is better to excavate the deeper tunnel. Finally, safety coefficient is very small in the feet of the wall, so we' d better reinforce it and pay much attention to it during construction.

关 键 词:连拱隧道 地面倾角 偏压 施工优化 施工力学 

分 类 号:TU457[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象