潜浮式倒悬索跨海大桥施工技术  

Construction Techniques of Submerged Floating Reverse Suspended Cable Sea-crossing Bridges

在线阅读下载全文

作  者:杨吉新[1] 刘素云[1] 张可[1] 

机构地区:[1]武汉理工大学交通学院,武汉430063

出  处:《交通科技》2008年第2期1-3,共3页Transportation Science & Technology

基  金:国家高技术研究发展计划(863)项目(2007AA112107);国家自然科学基金项目(10372075)

摘  要:介绍了潜浮式倒悬索跨海大桥这一新桥型的结构形式和工作原理,探讨了潜浮式倒悬索跨海大桥的施工技术,提出了具体的施工方法和详细的步骤,内容包括桩基、承台、桥墩、锚碇、索系和主梁,讨论了施工难点及施工方法的可行性。Submerged floating reverse suspended cable sea-crossing bridge is a new type of bridge. The paper not only introduced its structure form and working principle but also made a exploration on its construction techniques. And it also offered means and steps of construction in detail. The main content includes pile foundations, cushion caps, piers, anchors, suspended cable system and main girder. Technique difficulties are also discussed in this paper, The construction method discussed was of preferable feasibility. Furthermore, its application will both be beneficial to the development of submerged floating reverse suspended cable sea-crossing bridge and be practically valuable to the con- struction of sea-crossing tubes.

关 键 词:潜浮式 倒悬索 跨海大桥 施工技术 

分 类 号:U448.14[建筑科学—桥梁与隧道工程] U455.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象