检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汪玉华[1]
机构地区:[1]中铁隧道集团有限公司洛阳科学技术研究所,河南洛阳471009
出 处:《施工技术》2009年第3期93-96,共4页Construction Technology
摘 要:在复杂的城市地下工程施工过程中,对施工引起的围岩及结构变形进行控制是决定施工成败的关键因素之一。北京铁路枢纽北京站至北京西站地下直径线工程ZJX-2标施工过程中,通过对盖挖法和CRD法各阶段施工引起的围岩及结构变形进行监测,系统分析地层与结构变位及两种施工方法之间的关系,总结出两种施工方法引起的围岩及结构变形规律,对指导施工、控制围岩及结构变形起到很好的作用,使施工始终处于可知可控状态。It is the critical factor to control deformation in the complex construction process of urban metro. By monitoring the deformation of adjacent rock and structure due to excavation cap method and CRD method construction, the relation between deformation of adjacent rock and structure is analyzed systematically, and the regularity between deformation of adjacent rock and structure and two job practices is summed up. Consequently it is helpful to instruct construction and control deformation of adjacent rock and structure.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222