检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥勘测设计院有限公司,湖北武汉430050
出 处:《桥梁建设》2009年第5期6-8,20,共4页Bridge Construction
摘 要:安庆铁路长江大桥是宁安城际铁路与阜景铁路共同跨越长江的通道,大桥全长2 996.8 m,主桥跨度布置为(101.5+188.5+580+217.5+159.5+116)m,为六跨连续钢桁梁斜拉桥。主梁采用3片主桁构造,桁高15 m,节间距14.5 m,桥面为正交异性板钢桥面。桥塔高210m,桥塔基础采用37根3.0 m钻孔摩擦桩基础,桩长分别为108 m1、13 m。斜拉索采用平行钢丝索,空间三索面扇形布置。主梁采用双悬臂安装、跨中合龙。静、动力计算分析表明大桥具有较高的刚度和良好的列车走行性。Anqing Changjiang River Railway Bridge will serve as a crossing for both the Nanjing-Anqing Intercity Railway and Fuyang-Jingdezhen Railway over the Changjiang River. The total length of the Bridge is 2 996.8 m and the main bridge is a six-span continuous steel truss girder cable-stayed bridge with span arrangement (101.5+188.5+580+217.5+159.5+116) m. The main girder for the main bridge is composed of three main trusses that are 15 m in height and 14.5 m in panel length. The deck is to be provided with the orthotropic steel plates. A pylon of the bridge is 210 m high, resting on the frictional pile foundation made up of 37 numbers of 43.0 m bored piles, respectively 108 m or 113 m in length. The stay cables are of parallel steel wire strands, which are to be arranged in three spatial cable planes in fan shape. The main girder will be erected by the double cantilever method and will be closed in midspan. The calculation and analysis of the static and dynamic load indicate that the designed bridge has good rigidity and favorable train running property.
关 键 词:客运专线 铁路桥 斜拉桥 钢梁 三主桁 整体桥面 桥梁设计
分 类 号:U448.13[建筑科学—桥梁与隧道工程] U448.27[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.196.9