福州绕城高速公路隧道施工机械的合理配置  被引量:12

Reasonable Deployment of Construction Machinery for Tunnel on Fuzhou Ring Expressway

在线阅读下载全文

作  者:杨平[1] 许炳照[1] 肖光书 杨黎宏 

机构地区:[1]福建交通职业技术学院汽车运用与工程机械系,福建福州350007 [2]福建路桥建设有限公司,福建福州350014

出  处:《筑路机械与施工机械化》2010年第6期70-72,共3页Road Machinery & Construction Mechanization

基  金:福州绕城公路西北段RA11合同段施工机械化研究(09KY13)

摘  要:结合福州绕城高速公路西北段隧道的实际施工情况,通过对地质条件、施工方法和机械的使用要求分析,再根据施工组织设计的工程量、计划工期和作业机械的技术能力、运距等进行机械化配置。在确保隧道机械化施工组织合理、科学的基础上,实现连续、高效作业。实践表明,对类似隧道机械化系统采用规范、合理的方式进行配置是必要的。In combination with the construction of tunnel on northwest section of Fuzhou ring expressway, the deployment of construction machinery is carried out according to the workload, planned construction period, technical capability and transport distance and so on, after the analysis on geological condition, construction technology and operational requirements of machinery. The operation is kept continuous and efficient on the basis of scientific organization. The practice indicates that it's necessary to apply reasonable mechanization system to tunnels.

关 键 词:隧道 施工 机械化配置 应用 

分 类 号:U455.3[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象