检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京城建设计研究总院有限责任公司,北京100037
出 处:《都市快轨交通》2011年第3期84-88,共5页Urban Rapid Rail Transit
摘 要:结合北京地铁10号线三元桥站——亮马河站区间盾构隧道旁穿南小街8号楼工程,分析两条盾构隧道小间距、长距离并行临近楼房的工程难点,介绍设计与施工采取的措施以及监测数据分析等工程实践。通过总结分析,得出工程实践中地铁区间盾构隧道小间距、长距离并行施工的相互影响规律和对楼房沉降的影响规律。Based on the project of two shield tunnels adjacent to No.8 Building in Nanxiaojie Street between Sanyuanqiao Station and Liangmahe Station of Beijing subway Line 10,the paper introduces the difficulties of construction for two small-spaced parallel shield tunnels in a long distance and next to a building.It also presents measures adopted in design and construction and analysis of monitoring data.Through the analysis,regularities of mutual influence between two small-spaced shield tunnels in the long parallel distance and induced subsidence of the adjacent building are obtained.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.159