新建盾构法区间隧道下穿既有明挖隧道的影响实例分析  

Analysis on Shield Tunneling beneath Existing Cut & Cover Tunnel

在线阅读下载全文

作  者:徐薇娜[1] 

机构地区:[1]上海市隧道工程轨道交通设计研究院

出  处:《地下工程与隧道》2011年第2期38-40,44,共4页Underground Engineering and Tunnels

摘  要:结合上海轨道交通11号线北段二期工程(江边风井—济阳路站盾构法区间隧道),对该区间下穿济阳路站68、号联络线暗埋段结构的附加变形影响进行数值分析,为确定该区间隧道结构施工时的地层损失率设计控制指标提供参考和指导;经施工实测数据比较,验证计算结果的可靠性。The study was combined with the phase 2 project of the north section of Shanghai Rail Transit Line 11,where there is a shield running tunnel(from the onshore ventilation shaft to Jiyang Road Station) shall pass through an existing cut and cover structure which is the linking track of rail transit line 6 and 8.The numerical calculation and analysis were made to the additional deformation of structure and the calculation data was provided as reference for the design control index of the ground loss rate in construction of the shield tunnel.Later,the measuring data of the construction site proved the reliability of the calculation results.

关 键 词:轨道交通 区间隧道 盾构法 下穿 明挖法 暗埋段 地层损失 数值分析 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象