检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学机械系
出 处:《海洋工程》1999年第2期2-10,共9页The Ocean Engineering
摘 要:本文以实际工程中点支撑托管架支撑下的海洋管道为分析对象,采用B样条函数分段拟合了从张紧器到海床间整段管道在铺设时的空间曲线,利用样条函数配点法求解管道的平衡微分方程,得到了管道在铺设过程中所必须的数据。本方法适用性好,理论简明,求解快,精度高。The submarine pipelines on the point supported stingers are analyzed in this paper. The authors simulate the 3 D curve of the submarine pipelines from tensioner to touch down point during installation by using B Spline, solve the difference equations of the curve by using the method of spline collocation, and obtain needed data during installation. The principle is clear, the results obtained by this method are equally accurate and less computational work is needed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222