高速铁路斜拉桥上无缝线路纵向力研究  被引量:42

CWR Longitudinal Force of Cable-stayed Bridge of High-speed Railway

在线阅读下载全文

作  者:闫斌[1] 戴公连[1] 

机构地区:[1]中南大学土木工程学院,湖南长沙410075

出  处:《铁道学报》2012年第3期83-87,共5页Journal of the China Railway Society

基  金:国家自然科学基金资助项目(50678176)

摘  要:采用带刚臂的梁单元模拟桥梁,用非线性弹簧模拟线路纵向阻力,并采用相关文献试验结果进行验证。以该模型为基础,建立塔-索-轨-梁-墩-桩的斜拉桥整体空间有限元模型。以沪昆高速铁路某(32+80+112)m槽型截面单塔斜拉桥为例,对斜拉桥上无缝线路纵向力传递规律进行分析;计算纵向力对斜拉索和塔墩影响;探讨桥梁截面形式、线路纵向阻力模型、斜拉桥约束方式、主梁和拉索温度变化、风压以及钢轨伸缩调节器设置位置等设计参数对纵向力影响;提出相关取值建议。The beam element with rigid arm was used to simulate the bridge,the nonlinear springs were used to simulate the longitudinal resistances of rail and the bridge-track interactions were verified with reference to the experimental results specified in relevant Documents.On the above basis,the tower-cable-rail-beam-pier-pile finite element model of the cable-stayed bridge was established.The(32+80+112) m U-sharp section and single-tower cable-stayed bridge of the Shanghai-Kunming High-speed Railway was taken for case-study: The transmission law of CWR(continuously welded rail) longitudinal forces on the cable-stayed bridge was analyzed;the impact of the longitudinal forces on the cable and tower was calculated;the influence of the design parameters such as the bridge section,the longitudinal resistance model of rail,the restraint plan of the cable-stayed bridge,the temperature variations of the main beam and cable,wind pressures,the rail expansion regulator positions and so on on was studied;recommendations were made for determination of related values.

关 键 词:铁道工程 铁路桥梁 斜拉桥 无缝线路 纵向力 

分 类 号:U441.7[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象