纵向地震作用下大跨斜拉桥主引桥碰撞效应研究  

A Study on Effect of Pounding at Expansion Joints on Seismic Response of Long Span Cable-Stayed Bridge Under Longitudinal Earthquake

在线阅读下载全文

作  者:雷凡[1] 邓育林[1] 杨吉新[1] 

机构地区:[1]武汉理工大学交通学院,武汉市430063

出  处:《公路》2012年第9期61-66,共6页Highway

基  金:国家863计划项目;项目编号2007AA11Z107;中央高校基本科研业务费专项资金资助项目;项目编号2010-Ⅳ-013

摘  要:地震作用下大跨斜拉桥梁端会发生很大位移,过大位移可能会导致主梁与引桥发生碰撞。针对地震作用下大跨斜拉桥伸缩缝处的碰撞现象,以一座大跨斜拉桥工程设计为例,采用非线性时程法研究了纵向地震作用下大跨斜拉桥主引桥碰撞效应对结构地震反应的影响规律。研究结果表明:碰撞效应不仅会产生很大的撞击力,而且可能使引桥地震力需求、引桥梁端位移、主引桥相对位移及引桥梁体搭接长度需求有较大增长,极易造成引桥的落梁或者破坏;但碰撞效应对主桥的地震需求影响较小。For a long span cable-stayed bridge, the seismic displacement at the end of the deck may se- verely exceed the allowance which due to the occurrence of the pound between the main span and the ap- proach span usually which can causes the collision of falling-beams and structures under strong earth- quakes. In this paper, based on the pounding phenomenon at expansion joints of long span cable-stayed bridge under strong earthquake and employing a long span cable-stayed bridge, with the time history ana- lysis method, the pounding effects of adjacent girders at expansion joints on seismic responses of long-span cable-stayed bridge are studied. The results indicate that the pounding can amplify the seismic demand of piers of the approach span and also can amplify the displacement of beam of the approach span, the relative displacement between main span and approach span and the hinge seat width of beam of approach span ob- viously and it causes easily the collision of falling-beams and structures under strong earthquakes. But the pounding has minor effects on seismic demand of the main span.

关 键 词:大跨斜拉桥 地震 碰撞效应 研究 

分 类 号:U442.55[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象