静力水准在超深基坑中间柱沉降实时远程监测中的应用  被引量:6

Application of Hydrostatic Leveling Technology in Real-time Remote Monitoring of Settlement of Intermediate Column of Super-deep Foundation Pit

在线阅读下载全文

作  者:马召林[1] 李元海[2] 李竹[3] 

机构地区:[1]中铁隧道集团有限公司技术中心,河南洛阳471009 [2]中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州221008 [3]天津城投建设有限公司,天津300381

出  处:《隧道建设》2012年第5期719-724,共6页Tunnel Construction

摘  要:中间柱的稳定性是超深地铁车站盖挖逆作法成败的关键之一,中间柱的沉降监控对结构的安全施工至关重要。以天津站交通枢纽超深基坑工程信息化施工为背景,首次采用静力水准量测技术对超深基坑盖挖法中间柱的沉降与隆起进行了远程自动化监测,并通过对监测数据与实际工程的安全状况进行分析,提出了对中间柱沉隆控制基准值应根据开挖深度及分层开挖阶段进行适当增大的建议,解决了中间柱沉隆的连续远程监测技术难题。The stability of the intermediate column is the key of cut-and-cover construction of super-deep Metro station. The monitoring of the settlement of the intermediate column plays a very important role in the safe construction of the Metro station. Remote and automatic monitoring is made, by means of hydrostatic leveling technology, on the settlement of the intermediate column of the super-deep foundation pit constructed by cut-and-cover method. The monitoring data and the construction safety are analyzed. Suggestion is made on the control standard of the intermediate column. Contin- uous monitoring of the intermediate column is realized.

关 键 词:交通枢纽 超深基坑 中间柱 静力水准 远程实时监测 

分 类 号:TU753.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象