基于改进粒子群算法的梯级水电站优化调度  被引量:3

Optimization Scheduling of Cascade Hydropower Stations Based on Improved Particle Swarm Algorithm

在线阅读下载全文

作  者:欧阳俊 袁中祥 郑丹[2] 贺忠尉 

机构地区:[1]恩施州电力公司,湖北恩施445300 [2]武汉大学电气工程学院,湖北武汉430072

出  处:《陕西电力》2013年第1期48-51,56,共5页Shanxi Electric Power

基  金:国家重点基础研究973计划(2012CB215201)

摘  要:梯级水电站的优化调度是一个具有复杂约束条件的大型动态非线性优化问题,运用标准线性粒子群算法求解有易陷入局部最优的特点。针对这个问题对惯性权重的更新策略进行改进,减弱了典型线性寻优的局限性,得到更优的优化结果。以恩施芭蕉河梯级水电站丰水期为例,建立以周期发电量最大为目标函数的梯级水电站的短期优化调度模型,运用粒子群优化算法对其进行求解,得到了较好的梯级水电站优化调度结果。Optimal scheduling of cascade hydropower stations is a large complex constraints dynamic nonlinear optimization problem which is very complex to deal with.Besides,the standard linear particle swarm algorithm is easy to fall into local optimum characteristics.To solve this problem,the paper improves the update strategy of the inertia weight so as to weaken the limitations of typical linear optimization and get better optimization results.Taking the rainy period of the Enshi Bajiaohe cascade hydropower stations as an example,this paper establishes the short-term optimization scheduling model taking the maximum of cycle generating capacity as objective function,uses the improved particle swarm optimization algorithm to solve the problem,and obtains a better schedule.

关 键 词:梯级水电站 优化调度 粒子群算法 改进惯性权重 

分 类 号:TV697.11[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象