基于随机活动工期的资源约束项目鲁棒性调度优化  被引量:19

Robust scheduling optimization for resource-constrained project based on random duration of activities

在线阅读下载全文

作  者:何正文[1] 刘人境[1] 徐渝[1] 

机构地区:[1]西安交通大学管理学院,西安710049

出  处:《系统工程理论与实践》2013年第3期650-659,共10页Systems Engineering-Theory & Practice

基  金:国家自然科学基金(70971105);陕西省自然科学基金(2009JM9001);中央高校基本科研业务费专项资金

摘  要:项目进度计划的鲁棒性对于不确定条件下项目的顺利实施具有重要影响.作者研究具有随机活动工期的资源约束项目鲁棒性调度问题,目标是在可更新资源和项目工期约束下安排活动的开始时间,以实现项目进度计划鲁棒性的最大化.首先对所研究问题进行界定并用一个示例对其进行说明.随后构建问题的优化模型,设计禁忌搜索、多重迭代和随机生成三种启发式算法.最后在随机生成的标准算例集合上对算法进行测试,分析项目活动数、项目工期和资源强度等参数对算法绩效的影响,并用一个算例对研究进行说明,得到如下结论:禁忌搜索的满意解质量明显高于其他两种算法;当资源强度或项目工期增大时,平均目标函数值上升,禁忌搜索的求解优势增强.研究结果可为不确定条件下项目进度计划的制定提供决策支持.The robustness of project schedule plays an important role for the smooth execution of project under uncertain conditions. The authors studied the resource-constrained project robust scheduling prob- lem with random duration of activities. The objective was to arrange the start time of activities so as to maximize the robustness of project schedule under the constraints of renewable resources and project duration. The studied problem was identified and illustrated by using an example at first. Then the opti- mization model was constructed and three heuristic algorithms, including tabu search, multiple iteration, and random generation, were developed. Ultimately, the algorithms were tested on a standard instance set generated randomly. The influences of activity number, project duration, and resource strength on the algorithms' performance were analyzed. An instance was utilized to illustrate the research in the paper and the following conclusions were drawn: The solution quality of the tabu search is remarkably higher than that of the other two algorithms; as the resource strength or the project duration increase, the average value of objective function climbs and the quality advantage of the desirable solution of the tabu search augments. The research in this paper can provide decision supports for the preparation of project schedule under uncertain conditions.

关 键 词:资源约束项目调度 优化模型 启发式算法 随机活动工期 鲁棒性 

分 类 号:C935[经济管理—管理学] F224.33

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象