检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张晨萌[1] 陈芒芒[1] 陈柏超[1] 袁佳歆[1] 蔡超[1] 袁傲[1] 田翠华[1]
出 处:《武汉大学学报(工学版)》2013年第2期212-216,共5页Engineering Journal of Wuhan University
基 金:国家重点基础研究发展规划(973计划)(编号:2009CB724506);国家自然科学基金项目(编号:50807041)
摘 要:为解决高速铁路牵引供电系统负序不平衡问题,在传统基于铁路功率调节器(Railway Power Conditioner,RPC)补偿的基础上,针对所需补偿容量较大的问题,提出了多变电站RPC协同补偿的理论.并对该方法进行了详细证明,推导了在各种情况下的安装容量和补偿方法,该方法较单个牵引变电站所需RPC容量可降低1/3的补偿容量,从而减小了成本.最后,进行了仿真验证,结果表明,该多站协同补偿方法具有可行性和有效性.High-speed train traction power supply system causes serious negative current problem. Railway power conditioner (RPC) is efficient in negative sequence compensation. A novel power quality collaboration compensation system and strategy based on RPC is proposed. The minimum capacity conducted is 1/3 samller than traditional single station compensation. Simulation results have confirmed that the collaboration compensation system proposed can achieve a good performance at the negative sequence compensation with capacity and cost efficient.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.125.194