上海明珠线二期工程穿越已建地铁1号线上体馆站换乘方案设计与施工研究  

Construction Study of the Second Phase of Shanghai Pearl Line Tunnelling Underneath the Existed Shanghai Metro Line No. 1 and the Change Scheme between them

在线阅读下载全文

作  者:姚宪平[1] 

机构地区:[1]上海市隧道工程轨道交通设计研究院

出  处:《地下工程与隧道》2000年第3期12-17,47,共6页Underground Engineering and Tunnels

摘  要:在上海闹市区,明珠线二期线路将穿越已建地铁1号线上体馆车站,以实现二线站台T型换乘。项目关键是有效换乘及穿越施工方案安全可行。设置换乘自动扶梯及共享站厅层,提高换乘效率;仔细分析原车站在穿越施工中的沉降与抗沉降因素,提出多重安全措施,使穿越更有把握。In Shanghai downtown area, a new Metro line will tunnel underneath the existed station of the First Metro for 'T' change between the both Metro Lines. The key is for the change more efficiency with doable plan. A series of special measures are designed as following:1) enlarge the spacing of running tunnel lines fully at the joint to set a pair of escalator,2)take away the work shaft to avoid endangering two tall buildings near by in the west side,3)open excavate close to the existed station in the east side to provide its additional supports and to get a good place for tunnelling easily as well as to obtain a station hall shared by the both lines, 4)improve on SMW method to fit the needs of deep excavation in the site embedded a lot of obstacles, 5) analyze exactly on factor of settlement & resistance to settlement, and plan a set of safe step to make the project more surely.

关 键 词:明珠线二期工程 T型换乘 穿越方案设计 施工作业 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象