京沪高铁徐州东站旅客人行天桥振动研究  被引量:8

Vibration study of passenger footbridge in Xuzhou East Station of Beijing-Shanghai high-speed railway

在线阅读下载全文

作  者:尹国高[1] 张高明[2] 李敬学[1] 颜锋[2] 

机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063 [2]中国建筑科学研究院,北京100013

出  处:《建筑结构》2014年第1期53-57,共5页Building Structure

摘  要:对京沪高铁徐州东站旅客人行天桥的振动及减振措施进行研究。通过实测和计算结果对比分析,确定列车风是引发天桥振动的主要因素,并进一步对列车提速情况下的振动响应进行计算;为确保人行天桥的安全性和舒适性,提出了合理可行的减振方案,并对各种减振方案的效果进行了计算分析。经计算,人行天桥采用增设立柱和阻尼器方案后,主梁跨中区域和桥面跨中区域的减振效果最为明显。The vibration and vibration reduction measures of passenger footbridge in Xuzhou East Station of Beijing-Shanghai high-speed railway were studied. Through comparative analysis of the measured and calculated results, train wind is the main factor to cause the vibration of passenger footbridge. The vibration response in the case of train speeding up was further calculated. To ensure the safety and human comfort level of the bridge, feasible vibration reduction measures were proposed and performance of measures was analyzed. Through calculations, the scheme of additional columns and dampers that the passenger footbridge adopted has obvious damping effects in midspan regions of main girder and footbridge.

关 键 词:高铁进站人行天桥 振动 列车风 舒适度 减振 

分 类 号:TU318.2[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象