检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李永乐[1] 乔倩妃[1] 陈克坚[2] 曾永平[2] 向活跃[1]
机构地区:[1]西南交通大学桥梁工程系,四川成都610031 [2]中铁二院工程集团有限责任公司,四川成都610031
出 处:《桥梁建设》2014年第2期12-19,共8页Bridge Construction
基 金:国家自然科学基金项目(U1334201;51278434);国家科技支撑计划课题(2012BAG05B02);铁道部科技研究计划(2009G004-D)~~
摘 要:车辆的运行会使大跨度斜拉桥产生纵向运动,为研究列车荷载作用下大跨度铁路斜拉桥主梁的纵向运动量、纵向受力性能以及塔梁连接刚度的影响,以韩家沱长江大桥为工程背景,采用车-桥耦合振动分析方法,计算了主梁纵向位移和速度响应,为纵向阻尼器的设计参数优化提供了依据;分析了塔梁间纵向相互作用力,给出了支座摩阻系数的上限值;计算了系统总刚度与弹性连接刚度的关系,明确了弹性连接刚度与纵向总刚度及主梁纵向位移之间的关系。研究表明:CRH2动车组对桥梁结构纵向动力响应的影响更明显;增加支座摩阻力可抵消由列车运行引起的结构体系纵向作用力,从而抑制主梁纵向运动;系统纵向总刚度随塔梁间弹性连接刚度的增大而增大,但非线性关系明显。The vehicles moving on the long span cable-stayed bridge will cause longitudinal movement of the bridge. To study the longitudinal movement amount and longitudinal force be- havior of the main girder of the long span railway cable-stayed bridge and the influence of connec- tion stiffness of the pylon and girder under the action of train load, the Hanjiatuo Changjiang Riv- er Bridge was cited as an example, the longitudinal displacement and velocity responses of the main girder were calculated, using the vehicle-bridge coupling vibration analysis method and the basis for optimizing the design parameters of the longitudinal dampers was provided. The longitu- dinal interaction forces between the pylon and girder were analyzed and the upper limit values of frictional coefficients of the bearings were given. The relationship between the system longitudi- nal total stiffness and elastic connection stiffness was calculated and the relationship among the e- lastic connection stiffness, longitudinal total stiffness and longitudinal displacement of the main girder was made clear. The results of the study demonstrate that the influence of the CRH2 Train Group on the longitudinal dynamic responses of the bridge structure is more significant. The in- crease of the fictional resistance of the bearings can offset the longitudinal action force of the structural system caused by the moving trains, hence, can suppress the longitudinal movement of the main girder. The system longitudinal total stiffness increases with the increase of the elastic connection stiffness of the pylon and girder, but the nonlinear relationship is significant.
关 键 词:铁路桥 斜拉桥 主梁 纵向动力性能 车一桥耦合振动 纵向刚度 动态摩阻力 有限 元法
分 类 号:U448.27[建筑科学—桥梁与隧道工程] TU311.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28