隧道岩溶处理面面谈  被引量:26

Treatment Measures for Karst Cave Encountered in Tunnel Construction

在线阅读下载全文

作  者:张延 陈中[2] 

机构地区:[1]中铁二局集团内昆铁路工程指挥部,云南水富县657800 [2]铁道部第二勘测设计院桥隧处,成都610031

出  处:《现代隧道技术》2001年第1期60-64,共5页Modern Tunnelling Technology

摘  要:岩溶对隧道工程的影响主要是洞害、水害、洞穴充填物及坍塌、洞顶地表塌陷四个方面。本文介绍了内昆铁路、南昆铁路部分典型隧道溶洞的处理措施,对同类工程有一定的参考价值。Usually there will appear four diseases caused by Karst cave encountered in tunneling: water flowing, collapse of filling and ground surface settlement. Generally there are various measures to deal with it, including spanning occluding, reinforcing and draining. In this paper, some measures for treating the typical Karst cave encountered in tunnels on Nankun railway and Neikun railway are presented, which will provide some reference value for the similar projects.

关 键 词:病害 溶洞 隧道 岩溶 处理措施 

分 类 号:U457.2[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象