检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨辉[1] 陆建飞[1] 王建华[1] 张庆华[1]
机构地区:[1]上海交通大学建筑工程与力学学院,上海200030
出 处:《上海交通大学学报》2001年第10期1512-1516,共5页Journal of Shanghai Jiaotong University
摘 要:借鉴日本东京湾的隧道分析方法 ,提出了适合于本课题的隧道分析的计算模型 ,即用等效质量 -弹簧系统代替地基切片 ,隧道用能承受剪力、弯矩和轴力的梁代替 .数值仿真表明 ,隧道与风井接头处的轴力、角位移、剪力较大 .如果总体设计允许的话 ,建议各段隧道的长度不宜相差太大 ,以减小地震波作用下隧道接头的动力相对位移和内力 .A spring-mass model was presented for numerical analysis of the response of a tunnel under the Huangpu River to actual earthquakes. In this model the soil is divided into many strips and each strip is simplified to a mass-spring system. The tunnel is treated as several beams connected by linear springs in longitudinal and lateral directions. The tunnel is connected with the soil also by linear springs in the same two directions. So the total tunnel-soil system is simplified to a rigid multibody system. The vibration response of this system during earthquake can be obtained by a computer program DAMB. From the numerical results it is recommended that every segment of the tunnel should be in the same length in order to reduce the nonuniform displacement and stress between the tunnel segments.
分 类 号:U452.28[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44