基于索、杆组合结构的电气化铁路接触网三维静态模型  被引量:11

Modeling of Steady State of Electric Railway Catenary Based on Nonlinear Cable and Truss

在线阅读下载全文

作  者:侯运昌[1] 刘志刚[1] 宋洋[1] 王英[1] 

机构地区:[1]西南交通大学电气工程学院,四川成都610031

出  处:《铁道学报》2014年第7期24-29,共6页Journal of the China Railway Society

基  金:国家自然科学基金(U1134205;51377136);中国铁路总公司科技研究开发计划(2013J010-B)

摘  要:基于有限元理论,采用二节点非线性索单元与线性杆单元离散接触网系统;根据索、杆的精确表达式推导单元切线矩阵;根据结构拓扑关系组装刚度矩阵和不平衡力矩阵,建立整体非线性平衡方程;利用NewtonRaphson法求解该平衡方程,建立接触网的初始平衡状态三维模型,并在模拟算例中得到线性收敛的计算结果。将计算得到的吊弦长度与现有的文献和软件计算结果对比,验证了本方法和模型的有效性。Based on the Finite Element Method,the catenary system was treated as a combination of two-node nonlinear cable elements and linear truss elements.By the accurate equations of cable and truss,the tangent matrices of the elements were deduced.According to structural topology information,the stiffness matrices and unbalanced force matrices were established,so as that the nonlinear integral equilibrium equation was built;through solving the equation with the Newton-Raphson method,the 3D initial equilibrium state model of catenary was built.The dropper length was calculated by examples and by comparing the results with published literature and commercial software the efficiency of the proposed method was vertified.

关 键 词:接触网 建模 初始平衡 非线性索 吊弦长度 

分 类 号:U225.1[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象